A manufacturing plant equipped with cutting-edge technology encompassing the entire process; from development to packaging of the medicines.

Olloki
Size
42,000 m²
Team
300 professionals
Production capacity
1,107 SKUs of finished product
Technologies
- Wet granulation
- Encapsulation
- Dry granulation
- Coating
- Compression
- Blister
Installations at the Olloki plant
AUTOMATED DEPOT
Built in 2010 and later expanded, this silo stands 23 meters tall and has space to hold 30,000 pallets.
PICKING OR ORDER PREPARATION AREA
At Cinfa, we ship orders to both wholesalers and individual pharmacies, which receive their products within an average of 48 hours.
We ship between 500,000 and 1,000,000 packs per day.SOLID MEDICINE PACKAGING
This is the facility where tablets and capsules are blister-packed and boxed for more than 1,100 medicine presentations.
We have the capacity to package 150 million treatments annually.HIGH-SPECIALITY GENERIC MEDICINES PLANT
These are high-containment facilities where qualified personnel develop and manufacture cancer treatments and immunosuppressants.
CENTRAL OFFICES
200 people work at this bioclimatic building with an open-plan design that encourages teamwork.
NAVE NEO
Inaugurated in 2024, this new Cinfa building, developed with 4.0 technology, will allow the company to double its current production to 200 million boxes annually.
At Neo, medications for high-prevalence diseases, such as hypertension, osteoarthritis, and various heart conditions, are already being manufactured.
Neo
The newest medicine development, manufacturing and distribution depot owned by Cinfa, designed to offer operational excellence that enables the supply and distribution of medicines that are essential to the treatment of high-prevalence diseases.
Industry 4.0.
Neo is equipped with a Plant Management System (PMS) that connects the software (IT) to the equipment (OT) in order to monitor and control every stage of production in real time. It enables manufacturing processes to be integrated, digitised and automated.
Vertical flow process organisation throughout the building
Materials travel around a high-containment closed circuit between plants, thereby maximising the quality guarantee in all processes. It allows mistakes to be avoided, production capacity, schedules and work flows to be optimised, and preventive and ergonomic measures for the professionals who work at Neo to be guaranteed.
High energy efficiency
Centralised enthalpy energy recovery system for air conditioning spaces that enables 73% of all thermal energy in the air in circulation at the plant to be transferred. The depot has a 1,900 m2 solar farm on its roof that provides 57% of the electricity needed by its silo.
- Opened in 2024
- 40 million dollars of investment
- 14,400m2 of production space
- +160 professionals